CCRM Civils LtdTender

Capability

Attenuation & Surface Water

Groundworks and installation activities for attenuation and surface-water systems to the issued design, manufacturer requirements and agreed package scope.

Typical scope for review

Excavation and formation; specified storage-system installation activities; associated drainage; backfill and reinstatement where included.

Information to send

Send the drainage design, storage-system details, levels, loading criteria, ground and groundwater information, specifications and access requirements.

Package boundary
Hydraulic design, specialist installation requirements, inspections and commissioning responsibilities must be confirmed for the selected system.

Delivery basis

How do you need it delivered?

Choose a model now or leave the final basis for review against your tender information.